Location: Pickwick Dam, Hardin County, Tennessee Burr & Cole has over 20 years of experience in working on the Marina at Pickwick Landing State Park. We were the prime designer for the Marina Master Plan almost 20 years ago. Since that time, we have been involved in numerous projects at the Marina, including a Courtesy Dock. Burr & Cole was the Prime Designer for this project that was the design and construction of a floating dock and anchorage system for a Courtesy Dock at the Pickwick Landing State Park Inn. Our scope included approach walks and an ADA accessible ramp. Burr & Cole was the Prime Designer for a significant repair and upgrade to the Marina. We provided design, bidding...
Read more Comments are closed
About: Mitch Hitch
Recent Posts by Mitch Hitch
Lucy Woodstock Marine Terminal Mooring Cell Repairs
Posted on by Mitch Hitch
in
Structural Engineering
Location: Memphis, Tennessee Lemm Corporation hired us to inspect and develop a repair plan for their 50 year old mooring cells. We coordinated the efforts of divers to investigate the cells below the waterline....
Read more Comments are closed
Oak Ridge Building and Time Warner / Comcast Building Koger Center
Location: Memphis, Tennessee Burr & Cole performed Tier 1 seismic evaluations in accordance with ASCE/SEI 31-03 “Seismic Evaluation of Existing Buildings”. The office buildings were evaluated for Life Safety Performance Level as defined by ASCE....
Read more Comments are closed
Recent Comments by Mitch Hitch
No comments by Mitch Hitch yet.