Civil Engineering design and construction management for this project was provided as part of the University’s renovation and upgrades to FedExPark Avron Fogelman Field. The existing grass was removed, leveled and the surface graded, then replaced with synthetic turf. Demolishing the outside wall and fencing were completed to allow for the installation of new fencing. The fence line was moved during installation along the third base line, decreasing the size of the foul territory.
