| About Us
Structural
Division
Brooks Museum
and more
Civil
Division
Riverbluff Walk
and more
E-Mail US
Projects
Continued
Structural and
Civil
Organization
Links
References
Awards
Construction
Progress (Con't)
Henry County Medical Ctr
Rhodes College Library
Back
to Home Page
|
2nd
Presbyterian Church
Significant enlargement of the
fifty-year-old
sanctuary
was accomplished by building a new longer span structure
over the existing sanctuary, while continuing it's use. Much
of the original ceiling, and ductwork was then suspended from
the new structure.
|
|
Christ the King Catholic
Church
Located at 785 Church Road, Southaven,
Mississippi
38671.
General construction consists of a 27,260 SF masonry church
building, a 9,730 SF education building, a 1,000 SF utility
building, a 200 space parking lot, and drives on a 13 acre site.
|
|
FedEx Forum Parking Garage
Based on the economics and speed of
construction
a pre-cast
concrete framing system was selected. The components will be
pre-cast concrete 28" deep double-tee with cast in place topping
slab, beams, columns, and shear walls. Lateral forces from wind
and earthquake will be resisted by cast in place, and pre-cast
concrete shear walls. Lateral forces against 33' high cast in
place
basement walls resisted by permanent soil anchors.
|
|
|